A tied reinforcing steel mat running the full slab, chairs and dowels set, ready for the pour
Rebar placing crew · Calgary & area

Built strong from
the inside out.

A rebar placing crew for Calgary-area general contractors and concrete formers. Place-only or supply-and-place. Give us a call — we'll tell you straight whether we can take it on.

1,900MT
Placed, trailing 12 months
10,400
Hours, no lost-time incident
3–7
Hands · one crew, one foreman
01

What we place, and who places it

Double-curtain wall reinforcing standing against shoring in an excavation
Wall curtainsShear, core, basement and retaining
A deck mat tied around a blockout, formwork boxed and braced before the pour
Deck & slab matsBlockouts, drops and openings
Curved foundation wall reinforcing set into formwork on a footing
FoundationsGrade beams, footings, curved walls
Shored excavation with poured foundation walls and dowels left for the next lift
Below gradePile caps, caissons, tie-ins

Scope

  • Deck & slab mats
  • Pile & caisson cages
  • Wall curtains
  • Post-tensioning
  • Column & pier cages
  • Couplers, dowels & stud rails
  • Grade beams & footings
  • Welded wire mesh

Place-only on your steel, or supply-and-place through our fabricator. One crew, one foreman, the same faces from the first dowel to the last inspection — working under your prime contractor's system.

The crew

Crew size, sized to the job3, 5 or 7 hands
ForemanOn the deck, every day
Lead time to start2–3 weeks
Takeoff turnaround48 hours
02

Recent work

Scope and tonnage. Names, addresses and references go out privately, not on a website.

A pump boom over a tied deck at first light, crew spotting the pour

Multi-family podium deck

Scope
Suspended deck, columns, shear walls
Tonnage
620 MT
Crew
5 hands
Tied out ahead of the pour window
A slab mat tied out with bar chairs and conduit set through it

Mixed-use infill

Scope
Slab-on-grade, grade beams, walls
Tonnage
410 MT
Crew
7 hands
Kept ahead of the forming crew throughout
A slab tied out end to end, conduit run and chaired ready for concrete

Parkade slab

Scope
Slab-on-grade, pile caps, curbs
Tonnage
185 MT
Crew
3 hands
Placed around a live services corridor
03

Get in touch

Easiest is a phone call. Otherwise leave your details and we'll come back same day.

368 · 210 · 1990

roughneckreinforcingltd@gmail.com

How we work

We are never the prime contractor. We work under yours — your orientation, your hazard assessment, your daily plan. One crew, one foreman, the same faces from the first dowel to the last inspection.

Tell us what your prequalification process needs and we'll get it to you.

Roughneck Reinforcing hoarding banner: Built strong from the inside out — 368 210 1990